EPA Signs Off On $46 Million Plan To Clean Up Kalamazoo River


OTSEGO, Mich. (AP) – The U.S. Environmental Safety Company has signed off on a 5-yr, $forty six million plan to wash up a stretch of the Kalamazoo River that’s contaminated from previous paper manufacturing.

The undertaking will cowl almost 2 miles of the river between Plainwell and Otsego Metropolis Dam. The Otsego dam shall be eliminated as a part of the work.

The plans are a part of ongoing efforts to wash up the eighty-mile Allied Paper/Portage Creek/Kalamazoo River Superfund website, which has been listed on the company’s Nationwide Priorities Listing since 1990. Plans are also within the works to redevelop the Allied Paper website.

A major concern for the EPA is PCBs leftover from industrial processes at paper mills that started working alongside the river within the Nineteen Fifties.

© Copyright 2017 The Related Press. All Rights Reserved. This materials is probably not revealed, broadcast, rewritten or redistributed.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *